r/IndustrialAutomation • u/Classic_Goat_4541 • 5h ago
5 mistakes I keep seeing in predictive maintenance projects
Predictive maintenance sounds straightforward: collect sensor data, train a model, and get a warning before a machine fails.
But getting a model to work in a pilot is one thing. Getting a maintenance team to trust it on the plant floor is another.
A few things that can go wrong:
- Choosing the AI model before identifying the failure that actually matters.
- Underestimating how messy industrial sensor data can be.
- Training on failure records that are incomplete or unreliable.
- Sending alerts without involving the people who operate the equipment.
- Treating deployment as the finish line instead of monitoring performance over time.
The fourth one is especially interesting. Even a technically good model has little value if operators stop paying attention to its warnings.
I think starting with one asset, one failure type, and a measurable outcome is a much better approach than trying to predict every possible failure from day one.
For those who have worked on predictive maintenance:
What was the biggest challenge in your project? Was it the data, the model, the false alarms, or getting people to actually use the system?
